← Back to the introductionThe work, made traceable.
Extract from the public work register. Existing artefacts and estimated effort are not an assurance of a completed shop integration.
Concept and design
Story, structure and visual guidelines for SONNWERK.
Connect origin and offer in a way you can follow.
20–30 hours · reconstructed. A reconstruction, not a timesheet; 40+ is self-reported.
Evidence IDs: ev-specs · Register as of: 2026-09-01
Publicly released summary from the existing work register. The underlying internal document is not published here; full evidence at the joint review.
Website and interaction
Built pages, product presentation and navigation; commerce integration remains launch work.
Give visitors a clear path to the product.
90–130 hours · reconstructed. A reconstruction, not a timesheet; 40+ is self-reported.
Evidence IDs: ev-pages, ev-loc, ev-git, ev-qa · Register as of: 2026-09-01
Current capture of the existing shop prototypeResearch and strategy
Existing research on channels, competitors and framework conditions. No activated campaigns.
Prepare future decisions with foundations you can check.
50–70 hours · reconstructed. A reconstruction, not a timesheet; 40+ is self-reported.
Evidence IDs: ev-strategy, ev-research, ev-analysis-system · Register as of: 2026-09-01
Publicly released summary from the existing work register. The underlying internal document is not published here; full evidence at the joint review.
Review and documentation
Existing review artefacts and documented development steps; not a blanket sign-off of every feature.
Keep changes and open points traceable.
15–25 hours · reconstructed. A reconstruction, not a timesheet; 40+ is self-reported.
Evidence IDs: ev-log, ev-specs · Register as of: 2026-09-01
Publicly released summary from the existing work register. The underlying internal document is not published here; full evidence at the joint review.