The work, made traceable.

Extract from the public work register. Existing artefacts and estimated effort are not an assurance of a completed shop integration.

Concept and design

Story, structure and visual guidelines for SONNWERK.

Connect origin and offer in a way you can follow.

20–30 hours · reconstructed. A reconstruction, not a timesheet; 40+ is self-reported.

Evidence IDs: ev-specs · Register as of: 2026-09-01

Publicly released summary from the existing work register. The underlying internal document is not published here; full evidence at the joint review.

Website and interaction

Built pages, product presentation and navigation; commerce integration remains launch work.

Give visitors a clear path to the product.

90–130 hours · reconstructed. A reconstruction, not a timesheet; 40+ is self-reported.

Evidence IDs: ev-pages, ev-loc, ev-git, ev-qa · Register as of: 2026-09-01

Current capture of the existing shop prototype

Media production

Four AI-produced narrative chapters from the field to the bottle. No documentary footage.

Make the intended origin and process story visible.

40+ hours · self-reported. A reconstruction, not a timesheet; 40+ is self-reported.

Evidence IDs: ev-media-source, ev-log · Register as of: 2026-09-01

Field · Harvest · Extraction · Bottle

Media preparation

Web-optimised media and derived single frames for the journey.

Provide media in suitable sizes.

20–30 hours · reconstructed. A reconstruction, not a timesheet; 40+ is self-reported.

Evidence IDs: ev-media, ev-frames, ev-scripts · Register as of: 2026-09-01

Publicly released summary from the existing work register. The underlying internal document is not published here; full evidence at the joint review.

Research and strategy

Existing research on channels, competitors and framework conditions. No activated campaigns.

Prepare future decisions with foundations you can check.

50–70 hours · reconstructed. A reconstruction, not a timesheet; 40+ is self-reported.

Evidence IDs: ev-strategy, ev-research, ev-analysis-system · Register as of: 2026-09-01

Publicly released summary from the existing work register. The underlying internal document is not published here; full evidence at the joint review.

Review and documentation

Existing review artefacts and documented development steps; not a blanket sign-off of every feature.

Keep changes and open points traceable.

15–25 hours · reconstructed. A reconstruction, not a timesheet; 40+ is self-reported.

Evidence IDs: ev-log, ev-specs · Register as of: 2026-09-01

Publicly released summary from the existing work register. The underlying internal document is not published here; full evidence at the joint review.